HomeBase Metals13 km tailing pipeline for Nkomati nickel mine

13 km tailing pipeline for Nkomati nickel mine

It is one of the largest nickel reserves in South Africa having estimated reserves of 408.6 Mt of ore containing an approximate 1.35 Mt of nickel metal.

The pipeline will connect to the cross valley tailings storage facility at Nkomati’s Onverwacht site.

TDS was contracted for the project by Robor Pipe Systems, with whom TDS has a long standing working relationship as one of their preferred sub-contractors.

According to TDS operations director, Willie Pieters, the two firms frequently collaborate on pipeline projects.

“Due to the competitive nature of the market TDS Projects Construction and Robor decided to work together on projects where pipes were to be supplied and installed. Robor is one of the major pipe suppliers in South Africa, and choose to partner with us based on our expertise, capability and excellent safety track record,” says Pieters.

The planned pipeline will consist of a 13 km long 400 mm pipe column.

The highest point will reach 1 468 m above sea level, and the lowest point will lie at 1 200 m above sea level.

The pipe column design was drawn up to be suitable for pumping slurry at a pressure of 64 bar.

TDS Projects Construction began construction on 16 October 2017 with Robor having already delivered 400 out of the 1170 required pipes.

According to Pieters, pipeline installations of this magnitude are not uncommon in the industry although this particular project does show some of Robor’s unique hallmarks.

“Robor has previously supplied several of these pipe columns already, however, the piping with a HDPE stub flange with a 14 mm thick HDPE lining is unique to Robor,” Pieters explains.

He goes on to say that this type of piping lasts longer and, is therefore, more cost effective in the long term.

According to Pieters, TDS Projects Construction is confident in their capability to complete the project on time and to the highest levels of quality.

“Very few contractors have the experience and expertise to take on an installation of this magnitude. This project proves not only TDS’s competency but also our competiveness in the market.”

Feature image credit: TDS Projects Construction

LATEST FEATURES